Select a category of inspection sheet:
204 - QC Piping Procedures
– Piping Demolition
– Bolting
– Disinfection Portable Water
– Piping Fabrication
– Piping Installation
– Pressure Pipe Testing
– Hot – Taps
– Tie – Ins
– Flushing
– Blinding Of Piping Equipment
– Socket Spacer Inserts
– Solvent Jointing Pvc Pipe
200 - QC CIVIL- PROCEDURES
– Surveying
– Site Handling – Civil Materials
– Civil Demolition
– Disposal Of Waste Material
– Excavation
– De-watering
– Back Filling
– Formworks
– Concrete Reinforcement
– Concrete Pouring
– Concrete Couring
– Grouting
– Concrete Repair
– Asphalting
201 - QC Building Procedures
– Concrete Floor Construction
– Building & Masonry Wall
– Dry Wall Installation
– Building Roof Installation
– Building Ceiling Installation
– Precast Building Installation
– Doors & Windows Installation
– Building Insulation
– Water Proofing
– Wall & Floor Finishes
– Raised Floor Installation
202 - QC Structural Procedures
– Site Handling Structural
– Structural Installation
– Structural Fabrication
– Structural Demolition
203 - QC Coating Procedures
– Coating
– Coating Material
205 - QC Insulation Procedures
– Surface Prep Insulation
– Application Of Insulation
– Cladding
– Heat Sleeve Pipe
– Tape Wrapping Piping
– Concrete Fire Proofing
– Refractory
206 - QC ELECTRICAL PROCEDURES
– Conduit Installation
– Demolition Of Electrical Equipment
– Storage Handling Electrical
– Cable Tray Installation
– Cathodic Protection
– Cable Pulling
– Grounding Systems
– Ductbank Installation
– Electronic Motor
– Generator Installation
– Switch Gear Installation
– Transformer Installation
– Battery Ups
– Junction Box Installation
– Motor Control
– Lighting System
– Control Panel
– Relay Installation
– Breaker Installation
– Cable Testing
– Grounding Systems
– Motor Testing
– Switchgear Testing
– Transformer Testing
– Battery Testing
– Conduit Seal Pouring
– Multiway Switch
– Termination Splicing
– In Plant Communication
– Termination & Splicing
207 - QC INSTRUMENTATION PROCEDURES
– Site Handling Instrument
– Demolition Or Instruments
– Instrument Preinstallation Calibration
– Installation – Transmitter
– Installation – Control Valve
– Installation – Switches
– Installation Safety Valves
– Installation – Analyzers
– Installation – Indicators
– Installation – Miscellaneous Instr.
– Field Pressure Test Instument Pipe
– Instrument Loop Check
– Fire Alarm
– Gas Detection
208 - QC WELDING PROCEDURES
– Site Welding
– Preheat & Interpass Heat
– Heat Treatment
– Post Weld Heat Treatment
209 - QC MECHANICAL PROCEDURES
– Pre-Installation Mech Equipment
– Protection Preservation & Maint Of Equipment
– Cold Cutting & Preparation For Hot Work
– Scaffolding
– Car Sealing
– Rigging
– Preservation Of Equipment
– Handling & Identification Mech Materials
– Installation Of Mechanical Equipment
– Tube Rolling
210 - QC ROTATING EQUIPMENT
– Preparation Of Rotating Equipment
– Rotating Equipment Alignment
280 - All Project Procedures
– All Project Procedures
Section Cost: $1500.00 - Consisting of all 110 QC Procedures for a discounted price.