1 - Material control QC inspection check sheets
– Material Receiving Report
– Over Shortage Damage Report
– Material Inspection Report
– Storage Report
– Handling Report
– Material Request Issue Slip
– Stock Card
– Material Return Slip
– Material Surplus List
– Material Accepted Label
– Material Rejected Label
– Material Hold Label
– Conditional Release Label
– Material Release Label
– Material Transfer Report
– Inspection Release Certificate
– Conditional Release Certificate
– Equipment Preservation Record
– Equipment Preservation Log
– Equipment Preservation Tag
– Equipment Preservation Matrix
2 - Surveys Inspection Check Sheets
– Final Inspection of Intersection Points, Pipe Support & Crossfalls
– Survey Report Pad and Equipment Area
– Final Inspection of Pipe Column
– Final Inspection of Pipe Column, Head, Shoe
– Final Inspection of Pipe Anchor
– Final Inspection of Road Crossing
– Final Inspection of Road
– Equipment Test
– Final Inspection of Secondary Pipe
– Fencing Inspection
– Survey Report
3 - Building Installation
– Asphalt Water Proofing Work
– Water Proofing Protection
– Damproofing Water Repellent Work
– Caulking and Joint Filler Installation
– Tile Work
– Wood Work
– Roofing Insulation, Roofing and Siding Work
– Down Spouts and Roof Drain Work
– Steel Framing Work
– Miscellaneous Metals Installation
– Inspection of Plaster Wall & Floor Finish
– Fixtures & Hardware Installation
– Glass and Glazing Installation
– Vinyl Floor Tile Work
– Gypsum Board Installation
– Acoustic Board Installation
– Piping Installation ( part 1 )
– Piping Installation ( part 2 )
– Sanitary Equipment Installation
– Miscellaneous Equipment Installation
– Pressure Test
– Leakage Test
– Fire Protection Equipment Installation
– Test Record of Piping and Ducting
– Building Inspection Record
– Acceptance of Builing Externals
– Acceptance of Builing Internals
4 - HVAC
– Air Handling Unit & Fans
– HVAC System Function Check
– HVAC System Noise Measurement
– Acceptance Certificate of Building Equipment
– HVAC Installation Check List
5 - Earthwork
– Sewer Piping Work
– Open Ditch
– Water Leakage and Sewer Line
– Installation of Main Sewer
– Pond Lining
– Gabions
– Rock Masonry Work
– Construction Using Culvert
– Placement of Base Course
– Placement of Structural Fill
– Placement of Structural Fill Foundation
– New Roads Finishing Work
– Compaction of Structural Fill
– Clearing of New Land
– Compaction Test of Sand Bedding by Clegg Hammer (part 1 )
– Compaction Test of Sand Bedding by Clegg Hammer (part 2 )
– Inspection of Landscaping
– Inspection of Landscaping Equipment
– QC Geotextile Check Sheets
– QC Membraines Liners Hot Shoe Calibration
– QC Membraines & Liners Leak Test
5-1 - Road construction
– Proctor Test
– Release For Backfill
– Re-use Of Excavated Materials
– Grading Chart For Sub-Base
– Grading For Base Course
– Aggregate Test Report
6 - concrete work
– Trial Mix Test of Concrete
– Compress Strength Test of Concrete
– Record of Anchor Bolts for Steel Structure
– Concrete Pour Record
– Tank Foundation Record
– Pre-Concrete Inspection Record
– Earth & Concrete Work Foundation
– Proctor Test
– Concrete Aggregates ( Table & Test Results )
– Cable Pull Pits Pre Pouring
– Cable Pull Pits Post Pouring
– Inspection of Reinforcing Bar Installation
– Cement Test Sheet
– Concrete Structure Checks Report Before Casting
– Pre-grouting Inspection Check List
– Aggregate Test Report
– Comprehensive Strength Test for Concrete
– Concrete Delivery For Ticket
– Grouting Inspection Record
– Backfilling Embankment Material Inspection and compaction Report
– Soil Testing Request
– Sieve Grading Report
– Soil Density Test Report
– Compaction Test Report
– Underground Gravity Sewers Leakage Test Checklist
– Field Steel Work Grouting Checklist
– Asphalt Concrete Check Report
– Grout Release Form
– Aggregate Summary Sheet For Sundry Test
– Geotextile Check Sheet
– HDPE Studliner/Geomembrane Checks and Test Reports
– Air Pressure Test Form Check And Test Reports
– Release for Liner/Membrane Laying
– Column and Tower Inspection Checklist
7 - Piping Work
– Pipework Pre-Test Checklist
– Hydrostatic Test Results Part 1
– Hydrostatic Test Report Part 2
– Flush Blow and Chemical Clean Acceptance Certificate
– Flushing and Cleaning Report
– Piping Works Installation Checklist
– Buried FRP Pipe Installation
– Mechanical Completion of Pipework
– Pipework Post Test Check List
– GRP/FRP Butt & Wrap Lamination (each Joint)
– GRP/FRP Adhesive Joint Preparation
– Hydrolic Actuated Valve
– Butterfly Valve
– Fire Hydrant
– Manually Operated Valve
– Mechanically Diverter
– Pneumatically Actuated Valve
– Motorized Valve
– Reciprocating Compressor
– Solenoid Operated Valve
– Safety Valve
8 - Piling
– Survey Report Piling
– Test Pile Data
– Pile Driving Log Sheet
– Pile Extension Record Sheet
9 - Structural
– Steel Work Fabrication Check List
– Steel Work Installation Check List
– Structure Installation Check List
– QC Steel Structure Inspect Check List
– QC Structural Checklist Report
– QC Structural Release
– QC Inspection Structural Steel Buildings
– Inspection Of Structural Steel Erection
– None Destructive Testing Report Structural
– Cutting & Drilling Structural
10 - Structural Steel for buildings
– Inspection of Structural Steel Fabrication
– Inspection of Structural Steel Erection
Section Cost : $24 - 2 Check sheets at $12 each
11 - Welding
– Welder Qualification Test
– Procedure Qualification Record ( part 1 )
– Procedure Qualification Record ( part 2 )
– Welding Procedure Specification
– Welders Qualification Log
– Welders Performance Chart
– Daily Field Weld Report
– Weld Travel Sheet
– Heat Treatment Instruction Sheet
– Consumeable Checklist for Welding Work
– Welding Repair Record
– Daily Field Weld Report
– WTD Attendance Sheet
– Structural Weld Travel Sheet SS2
– Structural Weld Travel Sheet SS2
– Weekly Welders RT Control Sheet
12 - NDE Special Processes
– Radiographic Examination Log
– Magnetic Particle Examination Log
– Liquid Penetrant Examination Log
– Ultrasonic Examination Log
– Radiographic Examination Report
– Liquid Penetrant Examination Report
– Hardness Testing Report
– NDT Qualification log
– Contractors Notice for RT Works
– RT Examination Report
– Welders Control Sheet Weekly
– Local Post Weld Heat Treatment
– Daily Dosemeter record
– Radiographic Record
– Calibration intervals
– Material List For Positive Material Inspection
– QA Pre-job RT Checklist
– Positive Material Inspection(PMI)
– Radioactive Isotope Movement Record
– NDE Clearance QC Checklist
Section Cost : $240 - 20 Check sheets at $12 each
13 - Pipe Cleaning Blow Down
– Pipework Pre-test Checklist
– Hydrostatic Test Report
– Flushing, Blowing and Chemical Cleaning Acceptance Certificate
– Post Pipe Cleaning / Blow Down Check List
– Mechanical Completion of Pipe Work
– Preparation Check for Pipe Cleaning / Blow Down
Section Cost : $72 - 6 Check sheets at $12 each
14 - Pressure Testing
– Pipework Pre Test Checklist
– Hydrostatic Test Report
– Pipework Post Test Check List
15 - Coating
– Daily Report on Paint Operations
– In-process Paint Inspection
– Accept Inspection of Paint System
16 - Insulation
– Insulation Inspection Record
– Equipment Piping Release for Insulation
– Field Lining Inspection
17 - Static Equipment
– Shop Fabricated Tank & Vessel Installation
– Heat Exchanger Installation Inspection
– Final Vessel Closure
– Special Equipment Inspection
– Auxiliary Equipment Index Miscellaneous Items
– Fired Heater Installation Inspection
– Fired Boiler Inspection
– Storage Tank Inspection
– Heat Exchanger Installation Inspection
18 - Rotating Equipment
– Equipment Protection, Preservation & Equipment
– Alignment Inspection
– Equipment Flange Alignment
– Compressor Inspection
– Pump Inspection
– Fan & Blower Inspection
– Electrical Motor Inspection
– Centrifugal Compressor
– Gear Box
– Pump Motor Running Test
– Centrifugal Seperator Static Test
– Compressor Running
– Coupling Alignment
– Centrifugal Separator
Section Cost : $168 - 14 Check sheets at $12 each
19 - Electrical Equipment
– Visual Inspection of Cadweld Connection
– Oil Dialectric Strength Test
– Construction Drawings Earthing Grid
– Cable Tray Inspection Check List
– Visual Inspection of Earthing Risers Installation
– Cable Pulling Inspection Check List
– Overall Completion of Earthing Grid
– Megger Reading Power Control Wire & Cable
– Visual Inspection of Earthing Wire Layout
– Meggar Reading Electrical Equipment inc Motors
– Cadweld Connection Earth Wire
– High Voltage DC Test Record 1kv Cable
– Insulation Resistance
– Ground Well Resistance Readings
– Switchgear Inspection
– Megger Reading Transformer
– Switchgear Inspection Record ( part 1 )
– Switchgear Inspection Record ( part 2 )
– 480v Switch Rack Inspection Record
– Motor Control ( part 1 )
– Motor Control ( part 2 )
– Liquid Filled Transformer
– Pre Commisioning of Power Transformers( part 1 )
– Pre Commisioning of Power Transformers( part 2 )
– Neutral Grounding Resistor Inspection Record
– Battery & Battery Charger Inspection Record
– Replacement of Field Control Station Test Record
– Connection of Existing Loads to New MCC’c T
– Internal Lighting Check Sheet
– Small Power Inspection Check List
– Distribution Boards Panel Inspection Check List
– Telephone System Inspection Check Sheet
– Underground Conduit Inspection Check List
– Above ground Conduit Inspection Check List
– Diesel Generator Installation Check List
– DCS-Console Desk Installation Check List
– Control Pane Installation Check List
– LV Bus Duct Connection Check List
– Local Pane & Box Installation Check List
– Lighting Protection Installation
– OA System Installation
Section Cost : $424 - 40 Check sheets at $12 each
20 - Instrumentation
– Site Inspection Certificate for Local Mounted Instruments
– Instrument Power Supply Inspection Record
– Alarm Annunciator Test Record
– Control System Punch List Record
– Control Systems Test Equipment Calibration
– Calibration Form ( part 1 )
– Calibration Form ( part 2 )
– Installation and Loop Check Record
– Megger Reading Instrument Wires Cable
– Instruments Installation Check List
20-5 - Instrumentation Calibration
– Control Valves
– Differential Pressure Transmitter
– Transmitter Remote Diaph. Seal
– Level Switch With Displacer
– Level Transmitter With Displacer
– Motorized Valve
– On/Off Valve Fail Closed
– On/Off Valve Fail open
– Oriface Plate
– Pressure Gauge
– Safety and Relief Valve
– Pressure Switch
– Pressure Transmitter
– Temperature Gauge
– Temperature Switch
– Temperature Transmitter
– I/P Transducer
– I Transducer
– Controller
– Temperature Element
Section Cost : $240 - 20 Check sheets at $12 each
21 - Gas Removal System
– Gas Removal System Check List Support Structure
– Gas removal System Check List Ejector, Condenser & Separator Installation
– Gas Removal System Check List Vacuum Pump Installation
22 - Overhead Crane
– Overhead Crane Installation Check List
23 - Generator
– Generator Installation Check List ( part 1 )
– Generator Installation Check List ( part 2 )
– Generator Installation Check List ( part 3 )
24 - Hotwell Pump
– Hotwell Pump Installation Check List
25 - Cooling Tower
– Cooling Tower Installation Check List
– Cooling Tower Installation Check List ( part 2 )
26 - Turbine
– Turbine Installation Check List ( part 1 )
– Turbine Installation Check List ( part 2 )
– Turbine Installation Check List ( part 3 )
27 - Condenser
– Condenser Check Sheet ( part 1 )
– Condenser Check Sheet ( part 1 )
28 - General Construction Punchlist Report
– General Construction Punchlist Report ( part 1 )
– General Construction Punchlist Report ( part 2 )
Section Cost : $24 - 2 Check sheets at $12 each
29 - Milestone Completion Certificate
– Milestone Completion Clearance
Section Cost : $12 - 1 Check sheet at $12
30 - Application for Inspection
– Application for Inspection
Section Cost : $12 - 1 Check sheet at $12
98 - ALL QC Construction Check Sheets
– ALL QC Cheek Sheets Consisting of 332 QC check sheets
Section Cost: $3984.00 - Consisting of all 332 QC Checksheets at $12 Each.