1. Material Evaluation and Approvals
- Supplier
- Mix designs & Trail Mixes
- Rebars & accessories
- Embedments
2. Inspection
- Survey & verification
- Compaction testing (foundations)
- Rebars & accessories
- Embedments
3. Erection
- Forms
- Rebars
- Embedments
- Accessories
4. Inspection
- Pre-Concrete inspection
- Survey report
- Compaction test report
- Complete inspection check list
5. Concrete Pour Inspection
- Trip ticket verification
- Slump
- Test Temperature check
- Cylinder sampling & casting
6. Concrete Curing
- Seven days wet curing
7. Compressive Testing
Three, seven and 28 days 4.000 psi min on 28 days
8. Completion of The Work
Inspection Check Sheets*
*For Inspection During Process
C-01 – TRIAL MIX OF CONCRETE
C-02 – COMPRESSIVE STRENGTH TEST OF CONCRETE
C-03 – RECORD OF ANCHOR BOLT FOR STEEL STRUCTURE
C-04 – CONTRIAL MIX OF CONCRETE
C-05 – TANK FOUNDATION RECORD
C-06 – EARTH & CONCRETE WORK FOUNDATION
C-07 – PROCTOR TEST
C-08 – CONCRETE AGGREGATES
C-09 – CABLE PULL PITS PRE POURING
C-10 – CABLE PULL PITS POST POURING
C-11- INSPECTION OF REINFORCING BAR INSTALLATION