QAQC IranQMAC
QA/QC SYSTEMS

Twitter

PHOTOS

 

Want to pay QA/QC Construction for services? Use the PayPal link below.

Pay QAQC

Quality System Management ISO 9000 (1994)

icon

 

Product Manufacturing
1] Procedures & Specifications
2] Codes & Standards
3] ASME Certification
4] NDT Procedures
5] Inspection & Test Plans
6] Material Inspections
7] Pre Inspection Kick Off Meeting
Projects Needs for Quality Implementation
Mission Statement
Planning & Scheduling
Constructability Program
Audits
Training
Purchased Materials & Equipment Inspection Requirements
1] Overshort & Damage Report
2] nonconformance Report
3] Preventative Maintenance Schedules
4] Control Of Customer Supplied Product
Quality Management Savings
Virtually No Rework
Zero Punchlists
Project Completed Under
Budget And On Time
Company Annual Savings
Motivated Employees
Customer Satisfaction
   

 

4.1] Management Responsibility
4.2] Quality System
4.3] Contract Review
4.4] Design Control
4.5] Document & Data Control
4.6] Purchasing
4.7] Control Of Customer
indentSupplied Product
4.8] Product Identification
indent& Traceability
4.9] Process Control
4.10] Inspection & Testing
4.11] Control Of Inspection
indentMeasuring & Test Equipment




LEVEL 1
QUALITY
ASSURANCE
COMPANY POLICY
MANUAL


supplied to the customer
usually at bid stage


LEVEL 2
QA MANAGEMENT PROCEDURES

supplied by subcontractor unless otherwise agreed

LEVEL 3
QC INSPECTION PROCEDURES
NDE PROCEDURES
METHOD STATMENTS



LEVEL 4
QC INSPECTION CHECK SHEETS
4.12] Inspection & Test Status
4.13] Control Of Non-
indentConforming Product
4.14] Corrective &
indentPreventive Action
4.15] Handling Storage Packing
indentPreservation & Delivery
4.16] Control Of Quality
indentRecords
4.17] Internal Quality Audits
4.18] Training
4.19] Servicing
4.20] Statistical Techniques