QC Contruction Procedures (overview)

Click here to goto QC Construction Procedures

     
     

Mechanical QC Procedures

  • PROTECTION, PRESERVATION. & MAINTENANCE OF EQUIP.
  • BOLTING
  • COLD-CUTTING & PREPARATION FOR HOT WORK
  • SCAFFOLDING
  • CAR-SEALING OF VALVES
  • RIGGING
  • GAS RELEASE PROCEDURE
  • SITE HANDLING & IDENTIFICATION OF PIPING MATERIAL
  • PIPING DEMOLITION
  • PIPING FABRICATION
  • PIPING INSTALLATION
  • PRESSURE TESTING OF PIPING
  • PRESERVATION OF EQUIPMENT
  • HOT-TAPS
  • TIE-INS
  • FLUSHING OF HYDRAULIC OIL CONTROL SYSTEM
  • SPACER INSERTS SOCKET WELDS
  • SITE HANDLING & IDENTIFICATION
  • PRE-INSTALLATION OF MECHANICAL EQUIPMENT
  • INSTALLATION OF MECHANICAL EQUIPMENT
  • ROTATING EQUIPMENT ALIGNMENT
  • ROTATING EQUIPMENT ALIGNMENT
  • PREPARATION OF ROTATING EQUIPMENT FOR OPERATION
  • TUBE ROLLING PROCEDURE
  • CONTROL OF SITE WELDING
  • PREHEAT AND INTERPASS HEATING
  • HEAT TREATMENT
  • POST WELD TREATMENT (UNDER AND ABOVE GROUND PIPING)
  • DEMOLITION OF ELECTRICAL EQUIPMENT
  • CONDUIT INSTALLATION
     
     

Civil Stuctural QC Procedures

  • SITE HANDLING & IDENTIFICATION STRUCTURAL MATERIALS
  • STRUCTURAL DEMOLITION
  • STRUCTURAL FABRICATION
  • STRUCTURAL INSTALLATION
  • SITE HANDLING AND IDENTIFICATION OF CIVIL MATERIALS
  • SURVEYING
  • SITE PREPARATION
  • CIVIL DEMOLITION
  • DISPOSAL OF WASTE MATERIALS
  • EXCAVATION
  • DEWATERING
  • BACKFILLING
  • FORMWORK
  • CONCRETE REINFORCEMENT
  • CONCRETE POURING
  • CONCRETE CURING
  • GROUTING
  • CONCRETE REPAIR
  • ASPHALTING
  • CONCRETE FLOOR CONSTRUCTION
  • BUILDING MASONRY WALL CONSTRUCTION
  • DRY WALL CONSTRUCTION
  • BUILDING ROOF CONSTRUCTION
  • BUILDING CEILING CONSTRUCTION
  • DOORS AND WINDOWS INSTALLATION
  • BUILDING INSULATION
  • WATERPROOFING
  • WALL AND FLOOR FINISHES
  • RAISED FLOORING INSTALLATION
  • PRE CAST BUILDING CONSTRUCTION
     
     

Electrical QC Procedures

  • DEMOLITION OF ELECTRICAL EQUIPMENT
  • STORAGE, HANDLING & IDENTIFICATION OF ELECTR. MAT
  • CONDUIT INSTALLATION-
  • CATHODIC PROTECTION INSTALLATION
  • CABLE PULLING
  • GROUNDING SYSTEM INSTALLATION
  • DUCT BANK INSTALLATION
  • ELECTRIC MOTOR INSTALLATION
  • GENERATOR INSTALLATION
  • SWITCHGEAR INSTALLATION
  • TRANSFORMER INSTALLATION
  • BATTERY UPS SYSTEM INSTALLATION
  • JUNCTION BOX INSTALLATION
  • MOTOR CONTROL INSTALLATION
  • LIGHTING SYSTEM INSTALLATION
  • CONTROL PANEL INSTALLATION
  • RELAY INSTALLATION
  • BREAKER INSTALLATION
  • CABLE TESTING
  • GROUNDING SYSTEM TESTING
  • MOTOR TESTING
  • SWITCHGEAR TESTING
  • TRANSFORMER TESTING
  • BATTERY TESTING
  • CONDUIT SEAL POURING
  • MULTI WAY SWITCH INSTALLATION
  • TERMINATION & SPLICING HV CABLES
  • IN-PLANT COMMUNICATION SYST INSTALLATION
     
     

Instrumentation QC Procedures

  • SITE HANDLING & IDENTIFICATION OF INSTRUMENTATION
  • DEMOLITION OF INSTRUMENT
  • INSTRUMENT PREINSTALLATION CALIBRATION
  • INSTRUMENT INSTALLATION TRANSMITTER TRANSDUCERS
  • INSTRUMENT INSTALLATION CONTROL VALVES
  • INSTRUMENT INSTALLATION SWITCHES
  • INSTALLATION OF SAFETY RELIEF VALVES
  • INSTRUMENT INSTALLATION ANALYZERS
  • INSTRUMENT INSTALLATION INDICATORS
  • MISCELLANEOUS INSTRUMENT INSTALLATION
  • FIELD PRESSURE TESTING OF INSTRUMENT PIPING
  • INSTRUMENT LOOP CHECK
  • FIRE ALARM SYSTEM INSTALLATION TESTING
     
     

Coating QC Procedures

  • SITE HANDLING & IDENTIFICATION OF COATING MAT
  • COATING
  • TAPE WRAPPING (PIPING)
  • HEAT SHRINK SLEEVE (PIPING)
  • SURFACE PREPARATION FOR INSULATION
  • CLADDING
  • CONCRETE FIRE PROOFING