Project - QC Procedures Template

204 - QC PIPING PROCEDURES
200 - QC CIVIL- PROCEDURES
201 - QC BUILDING PROCEDURES
202 - QC STRUCTURAL PROCEDURES
203 - QC COATING PROCEDURES
205 - QC INSULATION PROCEDUES

206 - QC ELECTRICAL PROCEDURES
207 - QC INSTRUMENTATION PROCEDURES
208 - QC WELDING PROCEDURES
209 - QC MECHANICAL PROCEDURES
210 - QC ROTATING EQUIPMENT
280 - ALL Project Procedures

 

Payment can be made by secure server then emailed to your computer with payment statement
Try out our demo download and see what you get and how you receive it. DOWNLOAD  Download

Select a category of inspection sheet:

204 - QC PIPING PROCEDURES

  • PIPING DEMOLITION
  • BOLTING
  • DISINFECTION PORTABLE WATER
  • PIPING FABRICATION
  • PIPING INSTALLATION
  • PRESSURE PIPE TESTING
  • HOT - TAPS
  • TIE - INS
  • FLUSHING
  • BLINDING OF PIPING EQUIPMENT
  • SOCKET SPACER INSERTS
  • SOLVENT JOINTING PVC PIPE



    INSPECT
    Download
         
         
    200 - QC CIVIL- PROCEDURES

  • SURVAYING
  • SITE HANDLING - CIVIL MATERIALS
  • CIVIL DEMOLITION
  • DISPOSAL OF WASTE MATERIAL
  • EXCAVATION
  • DEWATERING
  • BACK FILLING
  • FORMWORKS
  • CONCRETE REINFORCEMENT
  • CONCRETE POURING
  • CONCRETE COURING
  • GROUTING
  • CONCRETE REPAIR
  • ASPHALTING



    INSPECT
    Download
         
         
    201 - QC BUILDING PROCEDURES

  • CONCRETE FLOOR CONSTRUCTION
  • BUILDING & MASONARY WALL
  • DRY WALL INSTALLATION
  • BUILDING ROOF INSTALLATION
  • BUILDING CELILING INSTALLATION
  • PRECAST BUILDING INSTALLATION
  • DOORS & WINDOWS INSTALLATION
  • BUILDING INSULATION
  • WATER PROOFING
  • WALL & FLOOR FINISHES
  • RAISED FLOOR INSTALLATION



    INSPECT
    Download
         
         
    202 - QC STRUCTURAL PROCEDURES

  • SITE HANDLING STRUCTURAL
  • STRUCTURAL INSTALLATION
  • STRUCTURAL FABRICATION
  • STRUCTURAL DEMOLITION



    INSPECT
    Download
         
         
    203 - QC COATING PROCEDURES

  • COATING
  • COATING MATERIAL



    INSPECT
    Download
         
         
    205 - QC INSULATION PROCEDUES

  • SURFACE PREP INSULATION
  • APPLICATION OF INSULATION
  • CLADDING
  • HEAT SLEEVE PIPE
  • TAPE WRAPPING PIPING
  • CONCRETE FIRE PROOFING
  • REFRACTORY



    INSPECT
    Download
         
         
    206 - QC ELECTRICAL PROCEDURES

  • CONDUIT INSTALLATION
  • DEMOLITION OF ELECTICAL EQIPMENT
  • STORAGE HANDLING ELECTRICAL
  • CABLE TRAY INSTALLATION
  • CATHODIC PROTECTION
  • CABLE PULLING
  • GROUNDING SYSTEMS
  • DUCTBANK INSTALLATION
  • ELECTRONIC MOTOR
  • GENERATOR INSTALLATION
  • SWITCH GEAR INSTALLATION
  • TRANSFORMER INSTALLATION
  • BATTERY UPS
  • JUNCTION BOX INSTALLATION
  • MOTOR CONTROL
  • LIGHTING SYSTEM
  • CONTROL PANEL
  • RELAY INSTALLATION
  • BREAKER INSTALLATION
  • CABLE TESTING
  • GROUNDING SYSTEMS
  • MOTOR TESTING
  • SWITCHGEAR TESTING
  • TRANSFORMER TESTING
  • BATTERY TESTING
  • CONDUIT SEAL POURING
  • MULTIWAY SWITCH
  • TERMINATION SPLICING
  • IN PLANT COMMUNICATION
  • TERMINATION & SPLICING



    INSPECT
    Download
         
         
    207 - QC INSTRUMENTATION PROCEDURES

  • SITE HANDLING INSTRUMENT
  • DEMOLITION OR INSTRUMENTS
  • INSTRUMENT PREINSTALLATION CALIBRATION
  • INSTALLATION - TRANSMITTER
  • INSTALLATION - CONTROL VALVE
  • INSTALLATION - SWITCHES
  • INSTALLATION SAFETY VALVES
  • INSTALLATION - ANALYZERS
  • INSTALLATION - INDICATORS
  • INSTALLATION - MISCELLANEOUS INSTR.
  • FIELD PRESSURE TEST INSTUMENT PIPE
  • INSTRUMENT LOOP CHECK
  • FIRE ALARM
  • GAS DETECTION



    INSPECT
    Download
         
         
    208 - QC WELDING PROCEDURES

  • SITE WELDING
  • PREHEAT & INTERPASS HEAT
  • HEAT TREATMENT
  • POST WELD HEAT TREATMENT



    INSPECT
    Download
         
         
    209 - QC MECHANICAL PROCEDURES

  • PRE-INSTALLTION MECH EQUIPMENT
  • PROTECTION PRESERVATION & MAINT OF EQUIPMENT
  • COLD CUTTING & PREPERATION FOR HOT WORK
  • SCAFFOLDING
  • CAR SEALING
  • RIGGING
  • PRESERVATION OF EQUIPMENT
  • HANDLING & IDENTIFICATION MECH MATERIALS
  • INSTALLATION OF MECHANICALEQUIPMENT
  • TUBE ROLLING



    INSPECT
    Download
         
         
    210 - QC ROTATING EQUIPMENT

  • PREPARATION OF ROTATING EQUIPMENT
  • ROTATING EQUIPMENT ALIGNMENT



    INSPECT
    Download
         
         
    280 - ALL Project Procedures

  • All Project Procedures



    INSPECT
    Download